Models/Vendor
xAI
Subscription plans
updated 2026-05-11SuperGrok
individual$30/ month
Grok 4 access with higher rate limits. Real-time X data.
- ✓Grok 4
- ✓X.com real-time access
- ✓Higher message limits
SuperGrok Heavy
individual$300/ month
Grok 4 Heavy multi-agent mode + unlimited message access.
- ✓Grok 4 Heavy (multi-agent)
- ✓Unlimited messages
- ✓Priority compute
Infrastructure intelligence
Full feed →Compute deals, data centers, silicon, and capex that shape xAI's training and inference economics.
- GPU supplyverified
NVIDIA GB300 ships at volume Q2 2026, replacing GB200 in hyperscaler deals
GB300 NVL72 began volume shipments in April 2026, six months ahead of original schedule. Each rack delivers 1.4x the FP8 throughput of GB200 NVL72 with the same power envelope. Microsoft, Oracle, and xAI are the largest Q2 2026 takers. CoreWeave disclosed first GB300 deployment May 7.
Accelerators: GB300 - Compute clusterreported
xAI Colossus 2: targeting 1M GPUs across Memphis + new Mississippi site
Colossus 2 — xAI's expansion target — aims for 550k Blackwell-class GPUs (GB200/GB300) in 2026, scaling toward 1M total accelerators by year-end. A second 2GW campus in DeSoto County, MS, is under construction to host the bulk of the buildout. Power deals announced with the Tennessee Valley Authority and Mississippi Power.
Accelerators: 1M · GB200/GB300Power: 2 GWLocation: Memphis, TN + DeSoto County, MS - Compute clusterverified
xAI Colossus: 200k H100 GPUs in 122 days at the Memphis ex-Electrolux site
xAI brought up its first Memphis training cluster, "Colossus", in 122 days — a build cadence unprecedented in the industry. The initial buildout was 100k H100s; xAI doubled it to 200k by early 2025 by adding H200s. Power was bridged with on-site mobile gas turbines while Tennessee Valley Authority capacity caught up. Colossus trained Grok 3 and is currently training Grok 4 successors.
Accelerators: 200k · H100/H200Power: 150 MWLocation: Memphis, TN
Models
Filter on /models →Recent news
No tagged articles yet.